Flexible Scheduling In Construction Project
  • Author(s): Divya V S
  • Paper ID: 1701739
  • Page: 59-65
  • Published Date: 11-11-2019
  • Published In: Iconic Research And Engineering Journals
  • Publisher: IRE Journals
  • e-ISSN: 2456-8880
  • Volume/Issue: Volume 3 Issue 5 November-2019
Abstract

The purpose of this project is to optimize the resources by using the methods "Resource allocation, Resource leveling, time cost trade off". Resource allocation is used to assign available resources in an economic way. Resource allocation is the scheduling of activities and the resources required by those activities while taking into construction both the resource availability and the project time. Resource levelling aims to minimize the period variation in resource loading. Resource levelling involves redistribution and imbalance of allocated work. Resource levelling techniques were developing to enhance the shape of the resource histogram by reducing its variations. Time cost trade of is project duration can be reduced by assigning more resources to project activity. Doing this however increases project cost. The critical path method is used for scheduling a set of project activities. The analysis of resources also done by using primavera software.

Keywords

Resource allocation, Resource Leveling, Time cost trade off, primavera.

Citations

IRE Journals:
Divya V S "Flexible Scheduling In Construction Project" Iconic Research And Engineering Journals Volume 3 Issue 5 2019 Page 59-65